Calfrac achieved revenue of $430.1 million during the third quarter, which was consistent on a sequential basis ... second horizontal fracturing fleet in the Vaca Muerta shale play and commencement of ...
On October 27 th the snubbing unit was positioned over the Akcakoca-3 well where 2 3/8” production tubing (“velocity string” or “VS”) was ran into the well through the existing 4 ½ tubing. The ...
There's nothing quite as humbling as walking into the office bathroom only to be confronted with the panda eyes worthy of London Zoo. Luckily, the beauty industry is boasting a new generation of ...