1 天
ABP Live on MSNFire Breaks Out At Under-Construction Sabarmati Bullet Train StationThe project covers Gujarat and Maharashtra, with a total of 12 stations planned at Mumbai, Thane, Virar, Boisar, Vapi, ...
As per a statement issued by the National High-Speed Rail Corporation Limited (NHSRCL), the agency responsible for the ...
A fire broke out at the under-construction Sabarmati bullet train station in Ahmedabad, Gujarat, possibly due to welding ...
A fire broke out at the under-construction Sabarmati bullet train station here in the early hours of Saturday, an official ...
A fire broke out at the under-construction Sabarmati bullet train station in Gujarat's Ahmedabad, an official told news ...
4 天on MSN
National High Speed Rail Corporation Limited has successfully launched a steel bridge over four railway tracks; two of ...
A fire broke out at the under-construction Sabarmati bullet train station here in the early hours of Saturday, an official ...
The project, which spans 508 kilometres, aims to reduce travel time between Mumbai and Ahmedabad to just over two hours. The ...
This steel bridge is the sixth to be installed as part of the Mumbai-Ahmedabad Bullet Train project. Out of the 17 steel ...
This segment features extensive infrastructure, including a 124.027 km-long viaduct and bridges, 36 crossings (with 12 steel ...
Fire breaks out at Sabarmati bullet train station during construction, no casualties reported, cause believed to be welding ...
As per a statement issued by the National High Speed Rail Corporation Limited (NHSRCL), the agency responsible for the ...
一些您可能无法访问的结果已被隐去。
显示无法访问的结果