By Noah Pond Thursday, Oct. 17, the Van Duzer was packed to the gills with sweaty college students, swaying adults, and more Raiders gear than I have ever seen in Humboldt. Nearly no one sat in ...
Cal Poly transition continues with groundbreaking of $100 million engineering and technology building By Savana Robinson Eight golden shovels dug into a long pile of dirt as dozens watched.